Confirm the product specification
Provide product type, material, size, color, packaging, logo and required quantity. For ESD products, also confirm resistance range and testing requirements.
Plan documents and packaging
Clarify carton labels, packing lists, inspection records, certificates and destination requirements before production. This reduces delays during shipment preparation.
Use a staged delivery plan
Samples, first-batch inspection and regular replenishment can be scheduled separately. Guangzhou Yicheng supports product selection, batch supply and shipment coordination.
Leave a Reply